STRUT · BUILDING SURVEY EXAMPLE

Interactive Full Building Survey Example

Explore an example Full Building Survey prepared by Strut Building Surveyors. This interactive report demonstrates how we record building condition, photographic evidence, defects, building pathology, repair recommendations and priorities when inspecting complex and historic properties.

The example below has been edited from a genuine survey of a Grade II listed historic property in East Yorkshire. It demonstrates both the technical depth of our inspections and the way our findings are presented through InstaSurv™.

Explore the interactive report ↓
STRUT BUILDING SURVEYORS · EXAMPLE REPORT

Full Building Survey

Grade II listed historic property · East Yorkshire

Detailed inspection, building pathology, conservation-led diagnosis, photographic evidence and practical repair recommendations.

Edited public demonstration · Client details withheld

Open report ↓
01 / SURVEY OVERVIEW

Survey dashboard

A detailed building survey should do more than catalogue defects. It should help the client understand the condition of the building, distinguish significant liabilities from routine maintenance and identify where expenditure should be prioritised.

Critical actions 8 Original report dashboard
Year-one forecast £33.5–51k Indicative capital allowance
Five-year forecast £81.5–116k Indicative capital allowance

Recorded asset condition

Good 17%
Fair 39%
Poor 44%
Dashboard figures are taken from the complete source survey. This public example reproduces selected findings rather than every inspection entry.
02 / PROFESSIONAL OPINION

Executive summary

The property is a Grade II listed dwelling of traditional construction incorporating solid masonry walls, clay pantile roof coverings, rendered and exposed brick elevations and historic timber joinery. The building has evidently undergone successive phases of alteration, repair and maintenance.

Many principal elements remain serviceable. The survey nevertheless identified a significant programme of conservation-led repair, together with several matters requiring more immediate investigation.

Of greatest concern is the condition and geometry of the principal chimney stack. The stack exhibits a pronounced lean and twist in conjunction with deterioration of the masonry, mortar joints and upper weathering details. Its condition is such that isolated patch repair would not, in our opinion, provide an appropriate long-term solution.

Significant outward distortion is also present to the rear gable wall. The wall appears to have experienced longstanding movement and existing restraint measures cannot be assumed to provide adequate lateral stability. A structural engineer experienced with traditional buildings should therefore assess this element before substantial repair is undertaken.

The principal clay pantile roof coverings are generally serviceable, but numerous roof-to-wall and chimney junctions rely on rigid mortar fillets rather than appropriately formed flexible lead weatherings. Cracking, shrinkage and previous patch repairs are consequently present at a number of vulnerable junctions.

The lead-clad dormer arrangements are also imperfect. Existing detailing directs water towards historic timber window fronts, increasing the likelihood of repeated wetting, coating failure and eventual timber decay.

Rear and side masonry displays localised spalling, deteriorated joints and substantial areas of hard cement-rich pointing. The latter is poorly suited to softer historic masonry because it can restrict evaporation through the joints and concentrate weathering within the brick faces.

The rainwater disposal system requires improvement. Particular matters include suspected asbestos-containing gutter components, local deterioration of fascia and soffit material and the absence of effective rainwater collection to part of the rear eaves.

Internally, water staining below bathroom accommodation requires prompt investigation to establish whether leakage remains active. Electrical and gas installations were not tested as part of the building survey and should be independently inspected where satisfactory current certification cannot be produced.

Because the property is listed, the method of repair is as important as the identification of the defect. Repairs should generally favour retention of significant historic fabric, compatible lime-based materials, traditional weathering details and proportionate intervention.

This public example is provided solely to demonstrate Strut’s reporting methodology. It is not a survey of the reader’s property and must not be relied upon as property advice.
03 / PRIORITY MATTERS

Principal risks

The following matters materially influence our overall assessment of the property and should be considered when planning acquisition, repair expenditure and further investigations.

Chimney instability Pronounced distortion combined with weathered masonry and deteriorated upper weathering.
Rear gable movement Outward barrelling and apparently ineffective historic restraint require structural assessment.
Roof junction leakage Rigid mortar fillets provide unreliable long-term weathering at moving roof junctions.
Historic masonry deterioration Cement-rich pointing and weather exposure are contributing to brick-face deterioration.
Rainwater management Missing collection, aged components and suspected asbestos-containing materials require attention.
Concealed moisture Plumbing leakage and restricted roof ventilation may affect concealed construction.
04 / CONDITION RATINGS

How to read the findings

CR3
Serious, significant or urgent defects requiring repair, replacement or further investigation.
CR2
Repair or replacement is required, although the matter is not necessarily immediately serious.
CR1
No significant current defect requiring repair beyond normal maintenance and monitoring.
NI
Not inspected, not tested or requiring separate specialist investigation.
05 / DETAILED INSPECTION

Building survey findings

The entries below demonstrate how observations are developed into a diagnosis, an assessment of risk and a practical recommendation. Photographs can be enlarged, findings searched and condition ratings filtered.

INSPECTION SECTION 01

Roof coverings

ITEM 01 · ROOF COVERINGS

Main clay pantile roof

CR1
RECOMMENDED TIMESCALE · ROUTINE MAINTENANCE

Inspection observation. The principal roof slopes are finished with traditional clay pantiles. The coverings are broadly well aligned and appear generally serviceable. Localised weathering, surface discolouration and biological growth are present, but widespread displacement or failure of the main field of roof coverings was not observed.

Building pathology

Weathering is consistent with the age and exposure of traditional clay roof coverings. Reduced solar gain to some slopes may also contribute to biological staining.

Implications

Individual pantiles will inevitably deteriorate and may fracture or slip over time, particularly following severe weather, but wholesale renewal is not presently justified by the visible condition of the main coverings.

Recommended action

Continue normal maintenance and replace isolated damaged pantiles using compatible traditional clay units. Retention of sound existing coverings is preferable to unnecessary wholesale replacement.

Surveyor’s additional commentary
Traditional pantile roofs should be considered as complete weathering systems. Junctions, ridges, abutments, flashings and underlay can fail even where the principal tile field remains serviceable. Those elements are therefore assessed separately below.
ITEM 02 · ROOF COVERINGS

Ridge tiles to side return

CR2
RECOMMENDED TIMESCALE · PLANNED REPAIR

Inspection observation. Several ridge tiles to the side return exhibit longitudinal and transverse cracking. No widespread displacement was evident at the time of inspection.

Building pathology

The cracking is consistent with long-term exposure, thermal cycling and freeze–thaw deterioration of the clay units.

Implications

Further fracture may ultimately result in localised displacement and increased exposure of the ridge junction to wind-driven rain.

Recommended action

Replace defective ridge units when associated roof and gable repairs are undertaken. New units should be compatible in material, profile and appearance with the historic roof.

ITEM 03 · ROOF COVERINGS

Roof abutments and mortar weathering

CR2
RECOMMENDED TIMESCALE · WITHIN 3 YEARS / AS ASSOCIATED WORKS PERMIT

Inspection observation. A number of roof-to-wall junctions rely upon rigid mortar fillets in place of properly formed flexible lead weatherings. Cracking, shrinkage, open joints and evidence of previous patch repairs are present.

Building pathology

Clay pantiles, masonry walls and adjoining roof structures respond differently to thermal, moisture and structural movement. A rigid mortar junction cannot accommodate this differential movement indefinitely and therefore tends to crack away from one or both adjoining materials.

Implications

Once cracking develops, wind-driven rain can pass through the junction and affect concealed battens, rafters, wall heads and internal finishes. Repeated local patching rarely provides a durable solution.

Recommended action

Defective mortar fillets should progressively be replaced with appropriately detailed lead weatherings. Depending upon the junction this may include stepped flashings, soakers, aprons and back gutters. Leadwork should be designed and installed in accordance with good practice including the principles of BS 6915.

ITEM 04 · ROOF COVERINGS

Lead-clad dormer windows

CR2
RECOMMENDED TIMESCALE · WITHIN 3 YEARS

Inspection observation. Existing lead detailing to the dormers directs rainwater towards and across the timber window fronts. Local deterioration of decorative coatings and timber joinery is evident.

Building pathology

The geometry of the existing leadwork provides inadequate projection and drainage away from the timber face. Repeated wetting accelerates failure of paint coatings and raises the moisture content of vulnerable timber.

Implications

Continued exposure increases the likelihood of localised timber decay, failed glazing compounds and eventual water penetration to the dormer construction.

Recommended action

Renew or modify the leadwork to provide improved falls and positive drips clear of the timber face. Historic joinery should be repaired and retained wherever reasonably practicable rather than automatically replaced.

INSPECTION SECTION 02

Chimneys & leadwork

ITEM 05 · CHIMNEYS

Principal chimney stack

CR3
RECOMMENDED TIMESCALE · PRIORITY / IMMEDIATE PLANNING

Inspection observation. The traditional brick chimney stack exhibits a pronounced lean and rotational distortion. Mortar joints are weathered and localised deterioration is present to upper masonry, flaunching and associated weathering details.

Building pathology

The present condition appears to reflect long-term exposure and historic movement in combination with deterioration of mortar, flaunching and weathering details. The distortion is substantially greater than ordinary irregularity associated with historic brick construction.

Implications

Further deterioration may reduce stability and create a risk of falling masonry. Defective weathering also increases the potential for moisture penetration into the stack and adjoining roof construction.

Recommended action

A coordinated repair should be developed rather than relying upon isolated patching. Subject to conservation requirements and safe access, this is likely to involve careful dismantling to a sound level and reconstruction using compatible masonry and mortar, together with renewed flaunching, pots and lead weatherings.

Why patch repair is unlikely to be sufficient
Repointing can address eroded joints but does not correct substantial geometric distortion or restore stability where the masonry as a whole has moved. Repair strategy therefore needs to respond to the structural condition of the stack rather than merely its surface appearance.
ITEM 06 · CHIMNEYS

Chimney flashings and soakers

CR2
RECOMMENDED TIMESCALE · WITH CHIMNEY WORKS

Inspection observation. Existing mortar and tile-based junctions around the chimney do not provide a dependable flexible weathering system.

Building pathology

Rigid mortar details deteriorate as the chimney, roof structure and roof coverings experience differential movement.

Implications

Failure can allow water to reach roof timbers, ceilings and internal chimney breasts before the defect becomes externally obvious.

Recommended action

Reconstruct the weatherings with correctly formed stepped lead flashings, soakers and appropriate apron and back-gutter details as part of the chimney repair programme.

INSPECTION SECTION 03

Rainwater goods

ITEM 07 · RAINWATER GOODS

Gutters and suspected asbestos-containing material

CR3
RECOMMENDED TIMESCALE · INVESTIGATE BEFORE DISTURBANCE

Inspection observation. Sections of existing guttering may contain asbestos-containing material. In addition, part of the rear main roof lacks effective eaves collection and local deterioration is present to fascia and soffit material.

Building pathology

Aged rainwater components and incomplete collection can permit repeated wetting of external walls and eaves. The composition of suspected asbestos-containing material cannot be confirmed by visual inspection alone.

Implications

Uncontrolled rainwater can accelerate masonry, joinery and decorative deterioration. Disturbance of asbestos-containing material without appropriate controls may present a health risk.

Recommended action

Obtain appropriate material sampling before disturbance. Repair or replace defective rainwater goods and provide effective collection to the rear eaves with positive discharge to a suitable drainage point.

INSPECTION SECTION 04

External walls

ITEM 08 · EXTERNAL WALLS

Historic brickwork and incompatible pointing

CR2
RECOMMENDED TIMESCALE · PLANNED CONSERVATION REPAIR

Inspection observation. Rear and side elevations contain spalled brick faces, open mortar joints and substantial areas of hard cementitious pointing.

Building pathology

Traditional softer brickwork was intended to function with relatively permeable mortar joints. Dense cement-rich pointing can inhibit evaporation through those joints and concentrate moisture and frost action within the adjacent brick faces.

Implications

Progressive spalling can result in avoidable loss of original masonry fabric. Water penetration through open joints can also increase moisture loading within solid walls.

Recommended action

Carefully remove defective inappropriate pointing where this can be achieved without damaging brick arrises. Repoint using a suitably specified lime mortar and selectively repair or replace severely deteriorated bricks using compatible units.

ITEM 09 · EXTERNAL WALLS

Distorted rear gable wall

CR3
RECOMMENDED TIMESCALE · PRIORITY STRUCTURAL ASSESSMENT

Inspection observation. The rear gable exhibits pronounced outward barrelling, defective finishes and open joints. Existing historic restraint measures cannot be assumed to provide effective lateral restraint.

Building pathology

The observed form is consistent with longstanding lateral movement or inadequate restraint rather than superficial render failure alone. Defective weathering at the wall head may also have contributed to deterioration.

Implications

Without establishing the nature and extent of the movement it is not possible to determine whether existing restraint is adequate or whether further movement remains likely.

Recommended action

Obtain assessment from a structural engineer familiar with traditional masonry construction. Any restraint or strengthening scheme should be coordinated with conservation-led masonry repairs and improved weathering to the wall head.

INSPECTION SECTION 05

Windows & external joinery

ITEM 10 · WINDOWS & JOINERY

Historic windows and shopfront

CR2
RECOMMENDED TIMESCALE · CYCLICAL MAINTENANCE

Inspection observation. Traditional timber sash and casement windows together with the historic shopfront require cyclical repair and redecoration. Localised distortion to slender glazing bars appears longstanding.

Building pathology

Historic external joinery is vulnerable where paint films break down and permit repeated moisture absorption into exposed end grain and joints.

Implications

Deferred maintenance can turn relatively minor joinery repairs into substantial timber replacement and can result in unnecessary loss of historic fabric.

Recommended action

Retain and repair original joinery wherever practicable. Undertake local timber repairs, overhaul opening sections, address glazing compounds and maintain suitable external decorative coatings.

INSPECTION SECTION 06

Roof voids & concealed construction

ITEM 11 · ROOF VOIDS

Main roof structure and insulation

CR1
RECOMMENDED TIMESCALE · MONITOR

Inspection observation. Accessible principal roof timbers appeared generally serviceable. Insulation installed between parts of the rafter construction restricts visibility and may influence ventilation of the traditional roof.

Building pathology

Later thermal improvements can alter the temperature and moisture behaviour of a traditional roof, particularly where ventilation paths are reduced.

Implications

Concealed condensation can develop where warm moist internal air reaches colder roof components and cannot readily disperse.

Recommended action

Monitor accessible roof timbers for evidence of dampness or fungal deterioration and review the ventilation and insulation strategy together when future roof works are undertaken.

ITEM 12 · ROOF VOIDS

Side-return roof void and gable junction

CR2
RECOMMENDED TIMESCALE · COORDINATE WITH GABLE REPAIRS

Inspection observation. Local underlay repairs and daylight at the roof/gable junction indicate imperfect weathering. Existing restraint details also warrant review in conjunction with the external gable distortion.

Building pathology

The condition reflects piecemeal historic repair and inadequate junction detailing at an already vulnerable part of the building.

Implications

Wind-driven rain may enter the roof edge and prolonged wetting can affect concealed timber and masonry.

Recommended action

Open and properly inspect the junction during planned gable works. Repair defective underlay and weathering and coordinate any required structural restraint with the engineer’s recommendations.

INSPECTION SECTION 07

Building services

ITEM 13 · BUILDING SERVICES

Electrical installation

NI
RECOMMENDED TIMESCALE · SPECIALIST TESTING

Inspection observation. Two consumer units were observed. Circuits, protective devices, earthing arrangements and fixed wiring were not electrically tested as part of the building survey.

Survey limitation

A visual building survey cannot establish the safety or electrical integrity of concealed wiring and protective devices.

Implications

The apparent condition or age of a consumer unit alone does not demonstrate compliance or serviceability of the installation.

Recommended action

Obtain a satisfactory current Electrical Installation Condition Report or commission testing by an appropriately competent electrician before relying upon the installation.

ITEM 14 · BUILDING SERVICES

Plumbing and bathroom leakage

CR3
RECOMMENDED TIMESCALE · PROMPT INVESTIGATION

Inspection observation. Water staining below bathroom accommodation indicates historic or potentially continuing leakage. A substantial proportion of the plumbing installation is concealed from view.

Building pathology

Potential sources include failed sanitary seals, waste connections, shower or bath junctions and concealed supply pipework.

Implications

Continued leakage can damage ceiling finishes and may eventually cause deterioration of concealed floor or ceiling timbers.

Recommended action

Investigate with a competent plumber, identify and repair the source, then allow affected construction to dry before final decorative reinstatement.

INSPECTION SECTION 08

Interior & safety

ITEM 15 · INTERIOR

Fireplaces and redundant flues

CR2
RECOMMENDED TIMESCALE · PLANNED IMPROVEMENT

Inspection observation. Several former fireplace openings are sealed without obvious provision for effective ventilation of the redundant flues.

Building pathology

Redundant flues can remain cold and moisture laden. Where airflow is restricted, evaporation is reduced and condensation may occur within the chimney.

Implications

Persistent dampness can contribute to staining, salt contamination and deterioration of internal chimney-breast finishes.

Recommended action

Provide appropriate ventilation to redundant flues. Any flue proposed for reuse should first be swept and inspected by a competent chimney specialist.

ITEM 16 · INTERIOR

Staircase glazing

CR3
RECOMMENDED TIMESCALE · PRIORITY SAFETY IMPROVEMENT

Inspection observation. A single-pane glazed screen adjacent to the upper staircase was identified as a potential impact-safety concern.

Assessment

The existing glazing cannot be assumed to provide the impact performance expected of modern safety glazing in a vulnerable location.

Implications

Breakage following accidental impact may result in injury, particularly given the relationship with the staircase.

Recommended action

Have the glazing assessed and develop an appropriate safety upgrade while taking account of the significance of historic joinery and any listed-building constraints.

INSPECTION SECTION 09

Heritage & energy considerations

ITEM 17 · HERITAGE

Listed building considerations

CR1
RECOMMENDED TIMESCALE · BEFORE SIGNIFICANT WORKS

Inspection observation. The property is Grade II listed and retains significant historic masonry, roof, chimney and joinery fabric.

Professional context

Listed status protects the building for its special architectural and historic interest. Alterations affecting significance may require Listed Building Consent.

Implications

Technically effective but historically inappropriate repair can damage significance, accelerate deterioration or create statutory difficulties.

Recommended action

Retain significant original fabric wherever practicable. Use compatible traditional materials and confirm consent requirements with the relevant conservation authority before undertaking significant alteration.

ITEM 18 · HERITAGE & ENERGY

Energy performance of historic fabric

CR1
RECOMMENDED TIMESCALE · LONG-TERM IMPROVEMENT

Inspection observation. The building incorporates traditional solid masonry and significant areas of single glazing. Thermal upgrading therefore requires a different approach from that commonly adopted for modern cavity-wall construction.

Building pathology

Historic fabric often relies upon moisture movement and evaporation through relatively permeable construction. Some modern impermeable insulation systems can alter this balance.

Implications

Poorly designed thermal upgrading can introduce cold interfaces, interstitial condensation and trapped moisture while damaging historic finishes.

Recommended action

Prioritise proportionate and reversible measures such as draught reduction, appropriate secondary glazing and carefully designed roof insulation. Seek whole-building advice before major wall-insulation works.

06 / SCOPE & LIMITATIONS

Understanding the inspection

The source survey was principally visual and non-destructive. Finishes, fitted furniture, floor coverings and other fixed components were not removed solely to expose concealed construction. Where elements could not be inspected, this was reflected in the assessment and recommendations.

Building services were visually observed but were not comprehensively tested. Electrical, gas, asbestos, structural and other specialist investigations were recommended where the limitations of a visual building survey prevented a reliable conclusion.

Aerial and photographic inspection can significantly improve understanding of inaccessible elevations and roof areas but does not necessarily provide the same information as close physical inspection or opening-up.

Indicative cost allowances are provided for budgeting and prioritisation where appropriate. They are not contractor quotations, tender returns or guarantees of the final cost of work.

Public demonstration.
This page contains an edited selection of observations from a larger commissioned inspection. Dashboard figures relate to the complete source report rather than only the items reproduced here. Client identity and confidential report information have been withheld.
07 / PROFESSIONAL CONCLUSION

From inspection to a practical repair strategy

The purpose of a detailed building survey is not simply to identify everything that is imperfect. It is to establish what matters, why it has occurred, what may happen if it is ignored and what should reasonably be done next.

In this case, the principal liabilities relate to the distorted chimney, rear gable movement, vulnerable roof junctions, deterioration of historic masonry and deficiencies in rainwater management. These matters should form the core of the initial repair programme.

Other defects can be incorporated into a planned programme of cyclical conservation and maintenance rather than being treated as emergencies. This distinction is particularly important with historic properties, where unnecessary intervention can be as damaging as deferred maintenance.

Where further specialist input is required, the purpose of that investigation should be clearly defined. A structural engineer, electrician, plumber or asbestos specialist should be instructed to answer a particular unresolved question rather than being used as a substitute for overall building diagnosis.

That combination of inspection, building pathology, prioritisation and practical repair advice is the basis of Strut’s approach to complex property surveys.

STRUT BUILDING SURVEYORS

Need this level of detail for your property?

Strut undertakes detailed surveys and building pathology investigations for historic, listed and technically complex properties. Our reports are designed to explain the building, diagnose defects and provide a practical route forward.

Our digital reporting environment is powered by InstaSurv™ . The technology provides the structure; the professional inspection, diagnosis and judgement remain ours.

Discuss your property survey →   Explore more report examples